Wednesday, August 29, 2012

Better late than never... the final inpection

Little late in sending these out, but attached are some new photos. 

The deck and stair rails were finished before our occupancy inspection on 5/11.  Seamless galvalume gutters to match the roof were put on – if you look there are 5 people holding a 100’ long piece of gutter when it was installed on the backside.  Driveway is rocked up to the concrete aprons.  Standing seam shower surround is finished (glass wall panels will be installed this week).

The final inspection was 5/11/12, Jason was up all the night the night  before the final inspection tying up loose ends. Things came down to the wire the day of the inspection with cleaning and sweeping, oh and waiting for GIANT stainless steel countertop to arrive and be installed, and the plumber to show up and plumb the kitchen sink. We were not sure if we were going to make the final inspection but with fingers crossed, tears cried and prayers said we went in to the inspection at 10 am hopeful but worried.








I was never so excited as to hear Steve give us the final OK, and know that we were really moving, for the final time into the wonderfully awesome home that Jason had put some much of his heart and soul, blood, sweat and tears into for the last 9 months. So this is the end of the building of the house at Belleau Bend and this is the beginning of the adventure of a lifetime...