via Jason: After a muddy start on Friday we are a little further along little further along. Put all the windows and doors in on the 1st floor & 2ndfloors, finished the soffits, and even put up a couple pieces of siding on Sunday afternoon. Geothermal field was installed on Saturday with a directional boring machine. The Craigslist roofer is working OK after I conducted a few installation seminars. For future reference an F-150 cannot pull a JLG out of the mud (a loaded boom truck could barely do it).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment